"CELS" - center of measuring systems. ph.: (095)191-68-69, (098)191-68-69 e-mail: zakaz@cels.com.ua Working hours: 9-00 - 18-00

Production / Test equipment / Test installations / electrical installation VGA-10

Installing a universal breakout VGA-10

Specify the price
Availability: under the order   Condition: new




1. PURPOSE

1.1 Installation breakout universal VGA 10 (hereinafter in the text & ndash; TOS-10) is designed to test the insulation of electrical equipment and materials alternating sinusoidal voltage of 50 Hz and the rectified voltage of negative polarity, regulated within 0 -10 kV with an output current to 100 mA

Scope & ndash; electrical engineering and energy.

Due to an increased output current setting can be used to test alternating voltage winding insulation of large electrical machines. C may be successfully used for the test safeners to the respective voltage (glove, etc.), as well as to charge the capacitive energy storage.

1.2 unit is designed for operation indoors or under a canopy at operating temperatures air from plus 5 & deg; C to + 40 & deg; C, relative humidity of 80% at a temperature of 20 & deg; C and atmospheric pressure 84,0 & ndash; 106.7 kPa (630 & ndash; 800 mm Hg...)

1.3 Power & ndash.; single phase sinusoidal alternating voltage of 220 & plusmn; 20 V, frequency 50 & plusmn; 1Hz

1.4 Installation operated by one operator with the right work on installations with voltages above 1000V

& nbsp;..

2. SPECIFICATIONS

2.1 The limits of the output voltage setting, kV 1; 3; 10

2.2 The above relative installation error and measurement output

voltage,%, no more than - 3

2.3 maximum output current, mA - 100

2.4 The above relative current measurement error,%, no more than - 3

2.5 threshold current protection mA - 102 & plusmn; 2

2.6 power consumption, V. A not more than 1000

2.7 Overall dimensions, the control unit - 320h200h355 high voltage unit - 315h290h410

2.8. Weight, not more than:

control unit - 15

high voltage unit - 25

2.9. Time of continuous operation at maximum power, hour - 8

2.10. The average life of the product, years & ndash; . 6

NOTE: kilovoltmeters installation measures the alternating voltage - the rms value, rectified on & ndash; voltage amplitude value.

Milliammeter AC measures the current value on the aligned

secondary (srednevypryamlennoe) current value.

Terms and Conditions   Shipping and payment   Warranties & Returns   Contacts

Documentation for download of the device not available

To order, fill out the form


cels.com.ua

Callback order form

cels.com.ua